Restoration: Establishing or Re-establishing a Complex Lab Ecosystem
A4BEE restored 100% connectivity for a global R&D hub in 3 months. Learn how we integrate complex lab OT with IT.
Solution
Industry
Life Sciences / R&D
Scope
System Integration / IoT / Connectivity / Network Segmentation / Disaster Recovery
Timeframe
3 Months
3
Months - sprint to full set up.
6
New Device Types – Integrated into the data loop.
100%
Validation of data integrity post-construction.
The client
A major R&D hub undergoing significant physical reconstruction looking to restore and upgrade the "Digital Nervous System" of the lab to minimize downtime and resume critical research.
Business needs
The client sought to rapidly restore digital connectivity disrupted by physical reconstruction by integrating a heterogeneous mix of legacy equipment and new, advanced analyzers into a unified, secure digital platform under strict time pressure.
The challenge
-
01
Vendor Complexity — Integrating devices from multiple vendors (Beckman Coulter, Roche, Hamilton) that use different communication protocols.
-
02
Network Security — Implementing strict VLAN segmentation to secure the OT (Operational Technology) layer while allowing data flow to IT systems.
-
03
Operational Pressure — The lab needed to be fully operational for science teams immediately after physical handover.
Our solution
-
Vendor-Agnostic Integration
Built custom drivers and connectors to ingest data from diverse instruments (Cell Counters, HPLC, Auto-samplers) into the central SCADA/Data platform.
-
Network Orchestration
Reconfigured the entire connectivity layer, ensuring secure and reliable data transmission from the edge to the cloud.
-
Rapid Deployment Teams
Mobilized a distributed team to validate data integrity from sensor to dashboard in real-time as physical devices were powered up.
-
Legacy & Future Bridging
Simultaneously restored legacy systems and onboarded new smart sensors, ensuring no gap in data continuity.
Technology used
- OPC UA
- TCP/IP
- VLAN Network Segmentation
- SCADA
- Industrial Drivers
- BioHT / Vi-CELL / NovaFlex
The outcome
The lab achieved full digital operability within the quarterly sprint cycle, with an upgraded device landscape. By restoring 100% connectivity and expanding the ecosystem, we ensured a seamless handover for scientists returning to the renovated facility with zero friction.
- 100% Connectivity Restored — Full data availability for all critical process units post-construction.
- Expanded Ecosystem — Successful integration of 6+ new device types into the central monitoring platform.
- Seamless Handover — Zero friction for scientists returning to the renovated facility.
- Data Integrity — 100% validation of data integrity across the entire lab network.
What we implemented
- System Integration — Centralized SCADA/Data platform integrating diverse instruments like Cell Counters and HPLC.
- Connectivity Layer — Secure and reliable data transmission reconfigured from the edge to the cloud.
- Real-time Monitoring — Sensor-to-dashboard validation ensuring data availability for all process units.
- Device Onboarding — Integration of 6+ new smart sensor and device types into the digital ecosystem.
Re-establishing a digital lab involves weaving a seamless web of connectivity that goes far beyond simple hardware installation. We harmonized a chaotic landscape of diverse machines into a symphony of data, ensuring the science could continue without missing a beat.
How can we help you?
Contact us todayOther success stories
-
Digital Lab
Controlled Perfusion of 3D Tumor Models
-
-
Digital Lab
NanOX Recovery Box Prototype