Losan
Updating the operating model
- Biotechnology
- January 2026
A4BEE prepared this analysis from publicly available sources. It reflects our own reading of Losan's published strategy and is not endorsed by, or produced in cooperation with, Losan. Company website
Strategic priorities
Losan operates across 4 stated priorities, with the most concrete near-term plan anchored on integrated cdmo services.
Deliver end-to-end pharmaceutical value chain from preclinical formulation through commercial manufacturing and global packaging under the "One-Stop-Shop" philosophy serving 70+ countries.
Specialize in sophisticated API performance enhancement through Hot Melt Extrusion (HME), nanomilling, and complex galenics including mini tablets and nanoparticulate systems.
Execute multi-digit million-euro investments in Eschbach campus with new production facility, high-bay warehouse, and logistics center for accelerated throughput.
-
01
Integrated CDMO Services
Deliver end-to-end pharmaceutical value chain from preclinical formulation through commercial manufacturing and global packaging under the "One-Stop-Shop" philosophy serving 70+ countries.
-
02
Advanced Drug Delivery Innovation
Specialize in sophisticated API performance enhancement through Hot Melt Extrusion (HME), nanomilling, and complex galenics including mini tablets and nanoparticulate systems.
-
03
Capacity Expansion Excellence
Execute multi-digit million-euro investments in Eschbach campus with new production facility, high-bay warehouse, and logistics center for accelerated throughput.
-
04
Regulatory & Quality Leadership
Elevate compliance to boardroom priority with QA-to-MD promotion, targeting "Audit-Ready 24/7" operations with full Annex 1 compliance for HPAPI handling at OEB 4 levels.
Challenges we see
- Operations Manufacturing
Technology Transfer Data Erosion
The transition from formulation development (Frankfurt/Neuenburg R&D) to full-scale manufacturing (Eschbach) results in critical data loss during scale-up, particularly for complex processes like Hot Melt Extrusion and nanomilling.
Estimated 66% of pharmaceutical development data is lost during technology transfer, causing extended validation timelines and batch failures during early commercial production.
- Digital Integration
IT/OT System Fragmentation
PLANTA project management system operates as an "isolated project management solution" not integrated with SAP ERP, while machine data from fluid bed coaters and tableting presses remains siloed within proprietary vendor software.
Manual reconciliation between project hours in PLANTA and financial data in SAP creates friction in cost control and resource capacity management across 600+ employees.
- Compliance Regulatory
Laboratory Data Integrity Gaps
Quality control and analytical laboratories rely on "Excel islands" for data tracking, with analytical results disconnected from central LIMS/ELN systems and offline from live process trends.
FDA data integrity scrutiny poses risks of "Official Action Indicated" status for missing audit trails, shared credentials, or unvalidated systems during tech transfer to production.
- Operations Manufacturing
Eschbach Commissioning Risk
New Eschbach production facility is in final commissioning stages with 11 packaging cabinets, 4+ fluid bed coaters, and high-bay warehouse requiring digital coordination before commercial operations commence late 2026.
Digital infrastructure trailing physical construction creates high probability of "ROI Gap" during first 12-18 months as staff struggle with manual data handovers in high-throughput facility.
- Compliance Regulatory
HPAPI Compliance and Containment
Frankfurt research center handles APIs up to OEL class 3b (OEB 4), requiring extreme containment protocols and alignment with updated EU GMP Annex 1 guidelines for sterile medicinal products.
Regulatory pressure to minimize human interaction with hazardous materials demands robotics and closed-system technologies not yet fully implemented across all sites.
Opportunities, by urgency and business impact
Each bubble is one opportunity, numbered to match the list below. Further right means it bites sooner; higher means a bigger effect on the business. A bigger bubble means a bigger implementation effort.
-
Disconnected Project and ERP Systems
PLANTA project management system is isolated from SAP ERP, requiring manual reconciliation of project hours with financial data and preventing real-time visibility into resource allocation and cost tracking across all company projects.
Deploy an ontology-based data integration layer that bridges PLANTA and SAP, automating cost tracking and resource allocation for the 600+ hybrid project management users while avoiding complete system overhaul.
-
Technology Transfer Data Loss
Up to 66% of pharmaceutical development data is lost during technology transfer from R&D to production, causing extended validation timelines and batch failures particularly for complex HME and nanomilling processes.
Create a digital "Data work" from source to scientist using an Industrial Data Platform that maintains data integrity and context throughout the scale-up process, enabling "failing virtually" before physical production.
-
Laboratory Excel Islands
Analytical results and quality control data remain trapped in offline Excel spreadsheets, creating a "broken data chain" between analytical equipment and scientist dashboards that increases data integrity error risk.
Implement unified lab digitalization connecting chromatography, stability testing, and QC equipment into a single platform that eliminates manual transcription and ensures ALCOA+ compliance for FDA audits.
-
Eschbach Visual Factory Gap
New Eschbach campus with 11 packaging cabinets and multiple fluid bed coaters lacks real-time OEE and performance tracking, leaving leadership without "Site-Level Dashboard" visibility during the critical commissioning phase.
Retrofit packaging lines and fluid bed coaters with IoT data acquisition enabling real-time OEE monitoring, "Golden Batch" comparison, and digital shop floor management to de-risk the multi-million-euro investment.
-
Knowledge Retention Crisis
As a 30-year-old company facing senior expert retirements, Losan's current digital tools are insufficient to capture and share "expert knowledge" effectively, leading to longer onboarding times for junior scientists.
Create "Intuitive Scratchpads" using UX-first design that enables senior scientists to digitize process nuances and institutional expertise before retirement, preserving critical tacit knowledge.
What we'd propose
- Enterprise AI
Enterprise Data Integration Platform
Deployment of an ontology-based middleware layer connecting PLANTA project management with SAP ERP to create unified visibility into project costs, resource allocation, and capacity planning without requiring system replacement.
-
Ontology layer
DETAIL
-
Predictive models
DETAIL
-
Decision surfaces
DETAIL
- Shorter lead time from data capture to decision.
- Records that audit on their own, not on inspection day.
- Scale without adding the same headcount.
-
- Digital CDMO
Digital Technology Transfer Platform
Implementation of an Industrial Data Platform that captures, contextualizes, and preserves pharmaceutical development data throughout the scale-up work from R&D formulation to commercial manufacturing.
-
OT/IT convergence
DETAIL
-
Batch intelligence
DETAIL
-
Production release flow
DETAIL
- Shorter lead time from data capture to decision.
- Records that audit on their own, not on inspection day.
- Scale without adding the same headcount.
-
- Digital Lab
Laboratory Digitalization Suite
End-to-end digitalization of QC laboratory operations integrating analytical equipment with central data systems to eliminate Excel islands, ensure ALCOA+ compliance, and create audit-ready data integrity.
-
Unified data backbone
DETAIL
-
Paperless workflows
DETAIL
-
Continuous QC release
DETAIL
- Shorter lead time from data capture to decision.
- Records that audit on their own, not on inspection day.
- Scale without adding the same headcount.
-
- Digital CDMO
Eschbach Visual Factory Implementation
Deployment of Industry 4.0 production intelligence across the new Eschbach campus enabling real-time OEE monitoring, performance tracking, and digital shop floor management for packaging and granulation operations.
-
OT/IT convergence
DETAIL
-
Batch intelligence
DETAIL
-
Production release flow
DETAIL
- Shorter lead time from data capture to decision.
- Records that audit on their own, not on inspection day.
- Scale without adding the same headcount.
-
- Digital Lab
Expert Knowledge Preservation Platform
UX-driven knowledge management system enabling senior scientists and process experts to capture, structure, and transfer institutional expertise to the next generation of pharmaceutical professionals.
-
Unified data backbone
DETAIL
-
Paperless workflows
DETAIL
-
Continuous QC release
DETAIL
- Shorter lead time from data capture to decision.
- Records that audit on their own, not on inspection day.
- Scale without adding the same headcount.
-
Digital maturity: today and target
Scored out of 100 across six dimensions. The target is what Losan's own published ambition implies — not a perfect score.
- IT/OT Integration 35 → 80
- PLANTA-SAP gap and siloed machine data indicate isolated systems; target reflects unified platform
- Data Governance 40 → 85
- Excel islands and manual data entry create integrity risks; target reflects automated ALCOA+ compliance
- Process Analytics 30 → 75
- Lack of real-time KPI visualization and Golden Batch comparison; target reflects embedded analytics
- Automation Maturity 45 → 80
- Digitalized shop floor meetings introduced but not connected to operations; target reflects closed-loop control
- Knowledge Management 25 → 70
- No structured system for expert knowledge capture; target reflects institutionalized knowledge transfer
- Regulatory Compliance Infrastructure 50 → 90
- QA elevation to MD level shows awareness; target reflects automated Annex 1 and data integrity compliance
Check this yourself
Our Service Portal has free self-assessments and market comparisons. These are the ones that line up with what we've read above — no sales call required.
-
Self-assessment
Data & AI Maturity
See how ready your data actually is for the AI work you're planning.
-
Self-assessment
Electronic Batch Record (eBR) Readiness
Check how far your batch records are from paperless, and what the next step is.
-
Market comparison
Pharma Data Platform Use Cases — Ranked
Use cases ranked by how hard they are against what they're worth.
-
Market comparison
European CDMOs Compared
The 2026 landscape: who does what, at what scale.
Think we've read this right?
Talk to usRelated reading
-
Developing a data and technology-driven flexible lab operations model
Now, when it becomes clear to the biotech companies that only by sharing the data they can thrive, everyone is looking for a solution.
-
From Paper to Performance: Operational Efficiency and Compliance in Labs
Transform your QC lab with scalable digital solutions that embed compliance, boost efficiency, and deliver a future-ready competitive edge.
-
Don’t let vendor lock-in hold your lab hostage.
How biotech labs avoid vendor lock-in by extending SCADA capabilities with flexible control platforms and multi-vendor integration.
-
OPC UA protocol support in embedded systems
OPC Unified Architecture (OPC UA) is a modern standard for data exchange, increasingly used in industrial environments.
-
Digital Twin Maturity Model – self-assessment tool
Initially, defining what a digital twin even is seemed simple - we have a real product and its virtual counterpart, and we combine the two.
This is an independent analysis prepared by A4BEE from publicly available information as of January 2026. It reflects A4BEE's own interpretation and opinion, is not affiliated with, endorsed by, or verified with Losan, and may be incomplete or inaccurate. All company names and trademarks are the property of their respective owners. To request a correction or removal, contact [email protected].